In 2017 several engineering studies were conducted on the Harbour to assess the current state of the waterfront assets, to assess the best locations for any new assets and to assess the feasibility of a fuel dock and an ice plant. These reports consisted of a Wind/Wave study, geotechnical studies, and a waterfront asset study.
The reports can be found here: https://www.dropbox.com/sh/919tx2k1wagkwrx/AADcjNuTeSTUfjSbsrCGp84oa?dl=0 .
The information also includes a summary provided by the engineering firm that provides recommendations on next steps for the Harbour Redevelopment project. For more information, please call 250-974-5728 or email edo@alertbay.ca